Our Projects

Our steady rise in reputation has seen us enjoy a lot of referrals and recommendations from partner companies we’ve worked with in various projects.Through the years, OMC Engineering has had the opportunity to be involved with quite a number of projects, both large and small.

Recent & Past Projects

NIPCO APAPA TANK FARM Online Valve Servicing, Replacement of Valves, Retrofitting, testing and other required facilities upgrade activities.
2018 Sept - Ongoing

Client: NIPCO TANK FARM APAPA
On-going

NAVGAS APAPA TANK FARM Online Valve Servicing, Replacement of Valves, Retrofitting, testing and other required facilities upgrade activities.
2018 July - Ongoing

Client: NAVGAS TANK FARM APAPA
On-going

OML 55 BELEMA OIL (Bell Oil Producing Ltd) Valves, End Closures, Pig-Passage Indicators On-Line Maintenance Project
2018 February - Ongoing

Client: Bell Oil Producing Ltd
Ongoing

OML 55 BELEMA OIL (Bell Oil Producing Ltd) Valves, End Closures, Pig-Passage Indicators On-Line Maintenance Project
2018 February - Ongoing

Client: Bell Oil Producing Ltd
Ongoing

SPDC WAST Pigging Manifolds
2018

Client: SPDC WEST OGBOTOBOR GAS PLANT
Work Completed Satisfactorily

TEPNG RUMUEKPE MET. STA. Online Valve Servicing, Replacement of Valves, Retrofitting, testing and other
2018

Client: TEPNG RUMUEKPE
Completed Satisfactorily

ADDAX PETROLEUM OML 123 Shut Down Valves and Control Valves Maintenance
2017 On-going

Client: Adanga, Ebughu, ADNA, ADNB, FPSO, Nimbo, Akkam
Ongoing

SPDC WEST FYIP (Forcados Yokri Integrated Projects)
2014 Ongoing

Client: SPDC YOKRI GAS PLANT
Ongoing

SPDC EAST Pigging Manifolds
March-Ongoing

Client: SPDC EAST SOKU PLANT Work Ongoing

Emergency Valves intervention on the Soku 40’’ x 600# EGGS 1 (Soku-Bonny Line) Maintenance Activities to assure IP (Intelligent Pigging) Completion.
Jan – Feb. 2016

Client: SPDC EAST SOKU PLANT
Completed Satisfactorily

Emergency Valves and Instrumentation intervention on the Soku 40’’ EGGS 1 & 2 Motorized Valves (Rotort IQ 3) Actuators, Loop Checks, and End Closure Maintenance Activities to assure IP (Intelligent Pigging) Completion. 40’’ x 900# Valves
July 2015- Sept. 2015

Client: SPDC EAST SOKU & GBARAN GAS PLANTS Completed Satisfactorily

Corrective Maintenance of Pneumatic, hydraulic and manual valve actuators from the Onne- Storage unit. Restore to full functionality and re-certify. Size ranges from 16’’ x 900# to 36’’ x 900#
Sept 2014- Feb. 2015

Client: Total Upstream Nigeria Limited.
Completed Satisfactorily

SPDC WEST YOKRI Valves and Pipe sections Flange Face Maintenance, resurfacing, treatment, re-installation of valves/pipe sections and Hot bolting. On more than 2500 flange faces and valves. Sizes Ranges from ¾’’ x 150# - 24’’ x 600#.
Dec 2013- Ongoing

Client: SPDC Work On-Going

SPDC EAST NEMBE 4 F/S. Inspect, Maintain, Upgrade, Calibrate and Re-certify damaged Instrument Control Panel. (Turn Key
July 2013

Client: SPDC
Completed Satisfactorily

TEPNG RUMUEKPE MET. STA. Online Valve Servicing, Replacement of Valves, Retrofitting, testing and other facilities upgrade activities.
June , 2013 – July 2013

Client: TEPNG RUMUEKPE
Completed Satisfactorily

SPDC WEST FYIP ( Forcados/Yokri Integrated Projects) NEFS, CLUSTERS JB and 3A Valves pre-commissioning valves testing, certification and upgrade
July, 2013 and Ongoing

Client: SPDC
On-Going

SPDC WEST YOKRI valves Corrective maintenance; Retrofitting and recertification of 27 Nos. failed valves SIL rated valves. HIV’s and other critical process control valves. Sizes Ranges from ¾’’ x 150# - 24’’ x 600#.
Feb. – June 2013

Client: SPDC
Completed Satisfactorily

SPDC WEST FYIP ( Forcados/Yokri Integrated Projects) YOKRI pre-commissioning valves testing, failed valves corrective maintenance, overhauls, certification and upgrade of valves and associated equipment’s.
July, - November 2012

Client: SPDC
Completed Satisfactorily

SPDC WEST FYIP ( Forcados/Yokri Integrated Projects) Southbank pre-commissioning valves testing, failed valves corrective maintenance, overhauls, certification and upgrade of valves and associated equipments.
April - July 2012

Client: SPDC
Completed Satisfactorily

NLNG/ NAOC Rumuji& Bonny terminal Metering Stations
April 2012

Client: NLNG/NAOC
Completed Satisfactorily

Total Exploration & Production Unld. Shut Down Overhauling of 4 nos. 16’’ x 2500# Fisher Control valves and integral fixtures,
March 2012

Client: TEPNG Obagi, Obite, Ogbogu, OML 58 and Amenam.
Completed Satisfactorily

Total Exploration & Production Unld. Call – Off On-line maintenance of metering skid isolation valves (MOV’s 6’’ x 600#)
Feb. 2012

Client: Total Exploration & Production Unld.
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance Call –Off Works. (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 40’’)
2012

Client: SPDC
Completed Satisfactorily

Total Exploration & Production Unld. Valves Interlocks, Call- Off works - valves on-line maintenance, offline overhauling, pressure testing, re-calibration and limit setting of MOV’s, CV’s, PRV’s and ESDV’s (4’’ – 16’’ Classes 150# - 2500#)
2012- Ongoing

Client: Tepng Olo, Obagi, Obite, Obogu, rumuekpe, OML 58 and Amenam.
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 36’’)
2011- 2013

Client: SPDC Completed Satisfactorily

Integrated Pipeline Pigging and Valve Maintenance ( Call –off Corrective Maintenance Interventions)
2010 – 2013

Client: SPDC
Completed Satisfactorily

Integrated Pipeline Pigging and Valve Maintenance ( Offshore On-line Servicing of FPSO Sea Eagle/Bonga Valves – (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 16’’)
2010

Client: SPDC
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 36’’)
2010- 2011

Client: SPDC
Completed Satisfactorily

Rumuekpe / Obite Metering Skid Valve Maintenance. 6’’ x 600# Conduit Valves on-line maintenance, off-line overhauling, pressure testing and re-installation.
2010

Client: Nigerian Gas Coy. Ltd.
Completed Satisfactorily

Intelligent Pigging and Auxilliary Pumping Services (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 40’’)
2009

Client: SPDC
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 36’’)
2007 - 2009

Client: SPDC
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 36’’)
2006

Client: SPDC
Completed Satisfactorily

Intelligent Pigging and Auxilliary Pumping Services (Valve Support Services/intervention)
2006

Client: SPDC
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 36’’)
2005

Client: SPDC
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 40’’)
2005

Client: SPDC
Completed Satisfactorily

16’’ Alakiri Metering Skid Valves (Removal of 4 No.s petrovalves and integral fixtures from line, overhaul, pressure test, re-calibrate and re-install.
2004

Client: Nigerian Gas Coy. Ltd
Completed Satisfactorily

Integrated Pipelines Pigging and Valve Maintenance Contract. (MOV’s, ESDV’s, PRV’s, RV’s, Pig Traps and integral fixtures, etc, Sizes Range from ¼’’ – 36’’)
1999 - 2005

Client: SPDC
Completed Satisfactorily